#10: WHAT ARE THE ESTIMATED COST SAVINGS PER UNIT?
COST SAVINGS CAN BE DETERMINED BY MULTIPLYING YOUR DAILY REVENUE LOSS (OR REPLACEMENT VALUE COST DELTA) BY THE LENGTH OF OUTAGE TIME BEING SAVED BY AN EXCHANGE ROTOR.
We estimate that about 4 weeks (or more) of critical path outage time can be saved by using an exchange rotor.
Created with Sketch.