PARAMETER
|
AERODERIVATIVE GAS TURBINES
|
RECIPROCATING ENGINES
|
Start time
|
Cold iron to full load in 5 mins
|
Cold iron to full load in >10 mins, 5 mins with hot standby
|
Maintenance
|
4,000 hr. or annual borescope inspection, 25,000 hr. intervals
|
2,000 hr. injection nozzles inspection/replacement, 4,000 hr. engine charge cooler inspection, 16,000 – 24,000 hr. overhaul interval, 32,000 hr. major intermediate inspection interval
|
Diesel pilot fuel on dual fuel engines
|
None required for gas operation – seamless transition
|
Distillate pilot fuel required(1 - 2% of fuel) for gas operation
|
Lube oil (150 MW - Peaker 2000 hrs/yr)
|
~666 liters/year due to evaporation
|
~133,000 liters/year direct consumption
|
Emissions
|
15/25 ppm NOx, 25 ppm CO
97 ppm NOx in liquid fuel
|
90 ppm NOx, 150 ppm CO, methane slips
900 ppm NOx in liquid fuel
|
Performance testing tolerance
|
No tolerance allowed
|
5% tolerance allowed on heat rate based on ISO 3046
|
Unit availability
|
>98%
|
~ 93 - 95%
|
Civil (foundation) requirements
|
Medium
|
Heavy
|
Normal ramp rate
|
20-50 MW/min.
|
~5 MW/min.
|