#4: HOW LONG DOES A CLEANING TAKE?
ONE BUNDLE WOULD TYPICALLY TAKE 1-2 SHIFTS OF 12 HOURS.
THOUGH THIS IS DEPENDANT ON A NUMBER OF VARIABLES:
Number of modules to be cleaned: this can be determined through inspection and pressure drop measurements during operation
Ease of access and confined space access requirements
Preparation activities (equipment set up, opening of manholes, making access holes in upper vestibule) and close out activities (debris removal (air flush and vacuuming), equipment removal, closing of holes in upper vestibule, closing of manholes)
A key benefit: NO SCAFFOLDING IS REQUIRED
Created with Sketch.